Why BIM?
- Minimize risk by confirming routing during preconstruction.
- Control your own destiny.
- Identify major conflicts.
- Minimize Field Change Orders.
- Identify potential VE items.
- Maximize pre-fabrication opportunities.
- Maximize efficiency of routing by greater visualization through the 3D model.
- Minimize hits, scrap, and rework through CAD Collision Detection.
- Accurate electronic Bill of Materials.
- Spool Drawings for prefabrication and direct downloads to prefabrication equipment.
- Allows Owner, Engineer, and Architect collaboration on the "as-built" prior to construction.
- Confidence of guaranteed routing through Coordination Sign-Off Drawings.
- Maximize installation efficiency.
- Decrease installation duration.
- Minimize "stockpiling" of material.
- Cleaner/Safer job site.
- "Just in time" delivery.
- Minimizes double handling of material.
- No waiting for other trades.
- No field routing.
- Enables hanger embed installation
- Critical items represented.
- Insulation; Roller Hangers; Pipe Stands; Valves; Service clearances; Equipment; Structural steel with fireproofing; Structural footings; Carriers.
- Take advantage of cross-trade common racking.
- Maximize holistic approach of "what's best for the customer".
- Enables possible integration of estimating software.
- Enables possible integration of rod length and hanger reports.
- Significantly reduces the "As-Built" process.
- Turn over a virtual as-built model to the owner with critical equipment information/tagging for Facilities Management.
- Apply your company's Best Practices.
- Less variation subject to Foreman quality.
- Provide your customers with a differentiating experience.